Belle II Document Server 2,013 records found  beginprevious74 - 83nextend  jump to record: Search took 0.00 seconds. 
74. TOP detector for particle identification at Belle II / E. Torassa on behalf of the TOP group [BELLE2-CONF-PROC-2024-012] Proceedings of FTCF2024
29 June 2024

The Time-Of-Propagation (TOP) counter is a ring-imaging Cherenkov detector designed to identify the charged hadrons in the barrel region of the Belle II detector. [...]
Fulltext: BELLE2-CONF-PROC-2024-012_v2 - Download fulltextPDF; BELLE2-CONF-PROC-2024-012 - Download fulltextPDF;
75. Upgrade of Belle II's Neural Network Trigger by Track Finding in Three-Dimensional Hough Space / Simon Hiesl ; Prof. Dr. Christian Kiesling [BELLE2-MTHESIS-2024-018] Presented on 12 04 2024 MSc
2024
Max-Planck-Institute for Physics / Munich
The target luminosity of the Belle II experiment, located at the SuperKEKB electron-positron collider in Tsukuba, Japan, is 6x10^{35} cm^{-2}s^{-1}. [...]
Fulltext: Download fulltextPDF;
76. 19th ARC: Mar. 03-04, 2014 / ARC [BELLE2-REPORT-2024-041]
03 March 2014

The Nineteenth KEKB Accelerator Review Committee Report
Fulltext: Download fulltextDOCX;
77. Belle II software review (June 19-20, 2013, MPI, Germany) / David Brown, Berkley ; Markus Elsing, CERN [BELLE2-REPORT-2024-040]
16 August 2013

Belle-II Software and Tracking Review Findings and Recommendations
Fulltext: Download fulltextPDF;
78. Technical Design Review of KLM Electronics and BEASTII (Dec 13, 2013, SLAC, USA) / BPAC [BELLE2-REPORT-2024-039]
13 December 2014

BELLE-II Review of Dec. [...]
Fulltext: Download fulltextPDF;
79. US Belle II Director's Review (Jan 16-17, 2014, PNNL, USA) / BPAC [BELLE2-REPORT-2024-038]
17 January 2014

US Belle II Director’s Review Final Report – January 16-17, 2014
Fulltext: Download fulltextPDF;
80. 8th Belle PAC: Feb. 9-11, 2014 / BPAC [BELLE2-REPORT-2024-037]
17 April 2014

B-factory Programme Advisory Committee Comments on Offline Computing Resource Requirement 8th meeting, 9 – 11 February 2014 at KEK
Fulltext: Download fulltextPDF;
81. BPAC focused review on Belle II Readout and DAQ Integration: Oct. 23-24, 2016 / BPAC [BELLE2-REPORT-2024-036]
07 September 2017

B-factory Programme Advisory Committee Focused Review Meeting 25–26 June 2017 at KEK
Fulltext: Download fulltextPDF;
82. 17th annual Belle PAC review meeting : Feb. 19-21, 2023 / BPAC [BELLE2-REPORT-2024-035]
13 November 2023

BPAC (full report) February 2023
Fulltext: Download fulltextPDF;
83. Study of the $B^{0} \to \gamma \gamma$ decay at Belle and Belle II / Shubhangi Krishan Maurya [BELLE2-TALK-CONF-2024-063]
21 January 2024
/ La Thuile 2024 - Les Rencontres de Physique de la Vallée d'Aoste
We report a study of the rare decay B0 → γγ, using data accumulated by the Belle and Belle II experiments and corresponding to integrated luminosities of 694 fb−1 and 362 fb−1, respectively. [...]
Fulltext: Download fulltextPDF;

Belle II Document Server : 2,013 records found   beginprevious74 - 83nextend  jump to record:
Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.