000000408 001__ 408
000000408 005__ 20161130085121.0
000000408 037__ $$aBELLE2-TALK-CONF-2016-030
000000408 041__ $$aeng
000000408 088__ $$aBELLE2-TALK-DRAFT-2016-007
000000408 100__ $$aPeter M. Lewis
000000408 245__ $$aStatus of SuperKEKB commissioning and Belle II detector construction
000000408 260__ $$aICHEP 2016$$c2016-08-05
000000408 300__ $$amult. p
000000408 520__ $$aThe SuperKEKB energy-asymmetric e+e− collider has now started commissioning and is working towards its design luminosity of 8×1035 cm−2s−1. The collisions will be recorded and analyzed with the Belle II spectrometer, the construction of which is on-going at the roll-out position. Highlights will include the outcome of Phase I commissioning of the SuperKEKB accelerator, BEASTII background commissioning and the most recent progress on the construction of the Belle II detector.
000000408 6531_ $$aBEAST
000000408 6531_ $$acommissioning
000000408 6531_ $$aPhase I
000000408 8560_ $$fdoris.yangsoo.kim@desy.de
000000408 8564_ $$uhttps://docs.belle2.org/record/408/files/BELLE2-TALK-CONF-2016-030.pdf