Abstract: The SuperKEKB energy-asymmetric e+e− collider has now started commissioning and is working towards its design luminosity of 8×1035 cm−2s−1. The collisions will be recorded and analyzed with the Belle II spectrometer, the construction of which is on-going at the roll-out position. Highlights will include the outcome of Phase I commissioning of the SuperKEKB accelerator, BEASTII background commissioning and the most recent progress on the construction of the Belle II detector.