Home > Status of SuperKEKB commissioning and Belle II detector construction |
BELLE2-TALK-DRAFT-2016-007 | |
BELLE2-TALK-CONF-2016-030 |
Peter M. Lewis
05 August 2016
ICHEP 2016
Abstract: The SuperKEKB energy-asymmetric e+e− collider has now started commissioning and is working towards its design luminosity of 8×1035 cm−2s−1. The collisions will be recorded and analyzed with the Belle II spectrometer, the construction of which is on-going at the roll-out position. Highlights will include the outcome of Phase I commissioning of the SuperKEKB accelerator, BEASTII background commissioning and the most recent progress on the construction of the Belle II detector.
Keyword(s): BEAST ; commissioning ; Phase I
The record appears in these collections:
Talks > Talk Drafts (Internal)
Public Talks