BELLE2-TALK-DRAFT-2018-003 BELLE2-TALK-CONF-2018-012

SuperKEKB and Belle II Status and Prospects

Riccardo de Sangro

23 January 2018
Bormio 2018

Abstract: The SuperKEKB accelerator complex will soon enter its second commissioning phase from February to middle of July 2018. The Belle II detector commissioning is in full swing to be ready to collect first collision data possibly delivered during phase II. The present status of the accelerator and detector commissioning will be presented together with some highlights of Belle II's rich physics program with an emphasis on the measurement accessible in phase II.

Keyword(s): SuperKEKB ; Belle II ; Physics ; Prospect ; Status
Note: 25 min

The record appears in these collections:
Talks > Talk Drafts (Internal)
Public Talks

 Record created 2018-02-09, last modified 2018-02-09


Fulltext:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)