BELLE2-TALK-DRAFT-2017-021 BELLE2-TALK-CONF-2017-059

SuperKEKB and Belle II Status

Riccardo de Sangro

09 June 2017
FPCP 2017

Abstract: The status of construction, commissioning and schedule of the SuperKEKB accelerator and Belle II detector will be presented.

Keyword(s): FPCP 2017 ; Belle II ; SueprKEKB
Note: 30 min including questions

The record appears in these collections:
Talks > Talk Drafts (Internal)
Public Talks

 Record created 2017-06-17, last modified 2017-06-18


Fulltext:
Download fulltextPDF Download fulltextKEY
Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)