BELLE2-TALK-DRAFT-2017-021 | |
BELLE2-TALK-CONF-2017-059 |
Riccardo de Sangro
09 June 2017
FPCP 2017
Abstract: The status of construction, commissioning and schedule of the SuperKEKB accelerator and Belle II detector will be presented.
Keyword(s): FPCP 2017 ; Belle II ; SueprKEKB
Note: 30 min including questions
The record appears in these collections:
Talks > Talk Drafts (Internal)
Public Talks