BELLE2-TALK-DRAFT-2016-029 BELLE2-TALK-DRAFT-2016-027 BELLE2-TALK-CONF-2017-007

Status of Belle II Detector

Katsuro Nakamura

05 December 2016
HINT2016

Abstract: Report on the status of the Belle II detector construction..

Note: 30+5 min Opening session

The record appears in these collections:
Talks > Talk Drafts (Internal)
Public Talks

 Record created 2017-02-08, last modified 2017-02-08


Fulltext:
Download fulltext
PDF

Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)