BELLE2-CONF-PROC-2016-005

Belle II early physics program of bottomonium spectroscopy

Hua YE

21 June 2016

Abstract: The Belle II experiment at the SuperKEKB collider is a major upgrade of the KEK "B factory" facility in Tsukuba, Japan. Phase 1 commissioning of the main ring of SuperKEKB has started in February 2016 and first physics data will be recorded in 2017 during the so-called Phase 2 commissioning, when the partial Belle II detector will be operated still without its vertex detector. In 2018, the full Belle II detector will be rolled in and physics run will start. In this proceeding, a possible physics program for this early data run at different center-of-mass energies is described, in particular at the ϒ(3S) and ϒ(6S) resonances, amongst other energy points.

The record appears in these collections:
Conference Submissions > Proceedings

 Record created 2016-06-22, last modified 2016-08-05


Fulltext:
Download fulltextPDF Download fulltextPDF (PDFA)
Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)